Project Description
This project consisted of the demolition of an existing two story cinema, which was replaced with 3 stories of office space, and street level retail.
The 2nd floor cinema had a sloping concrete floor, which was infilled with a sloping steel stud pony wall system to completely level the floor for office use.
Architect: Musson Cattell Mackey Partnership
Contractor: PCL Constructors Westcoast
Scope of Work:
- Steel Stud
- Batt Insulation
- Interior / Exterior Drywall
- Suspended Acoustical Ceilings